Tip: Copy and Paste Your Upcoming Meeting Information in this area.
TC 6.3 Forced Air Heating and Cooling
Hybrid Meting
Location: | Hilton Orlando 6001 Destination Pkwy, Orlando, Forida 32819 |
Tuesday, February 11, 2025 | Hilton Orlando, Key Largo B (Lower Level Hybrid Meeting |
1:00 – 3:00 pm (EDT) Main TC Meeting | Link to join hybrid meeting: TC 6.3 Web Meeting
Meeting number: 256 996669 32 Password: RKfmom |
TC 6.3 is concerned with those central forced air systems used for residential and light commercial building comfort heating and cooling.
Do you want to get involved in the following issues at the Society level?
Duct Conduction, Duct Leakage Induced Pressures and Infiltration/Exfiltration, HVAC Cycling Losses and Efficiency Impacts from Duct Leakage, Application of ASHRAE Standard 152, Impact of Blower Motor Efficiency on HVAC System Performance, Integration of Ventilation into Heating and Cooling Equipment, HVAC System Sizing, AC Sizing and Ventilation Performance
Read through the pages of this site, attend the annual meeting, or contact our Committee Chair or a subcommittee member.